top of page

Moorside Place, Burnaby, BC

Bridge Assessment & Temporary Stabilization

A structural and moisture assessment was completed for the pedestrian and vehicular bridges within the residential complex. The vehicular bridge showed signs of water infiltration, structural distress, and bearing pad damage. Immediate temporary support was proposed.

​

Scope of Work:

  • Moisture testing and asphalt condition inspection

  • Structural evaluation of bridge deck and railing system

  • Temporary steel shoring design for collapse prevention

  • Waterproofing and drainage upgrade plan

  • Cost estimates for emergency and long-term repair

IMG_7346.jpg

Project Gallery

IMG_7358.jpg
IMG_7374.jpg
IMG_7357.jpg
IMG_7353.jpg
IMG_7386.jpg
IMG_7347.jpg
MetroGold Home is comfortable  & well test  house

© 2023 by MetroGold Building Corporation ​

Contact Us

​

Office Contact:

Cynthia Lam 
Tel: (604) 388-1162
Jolie Wu
Tel: (604-771-6349

Project or Development Inquiries:

For all project-related questions or development opportunities, 

Email:

Visit Us

Head Office:
1200-11871 Horseshoe Way, Richmond, BC.

  • Facebook
  • LinkedIn
bottom of page